Item - 2014.PW29.3

Tracking Status

  • City Council adopted this item on April 1, 2014 without amendments and without debate.
  • This item was considered by the Public Works and Infrastructure Committee on March 4, 2014 and adopted without amendment. It will be considered by City Council on April 1, 2014.

PW29.3 - Contract Award - Tender Call No. 14-2014 F.G. Gardiner Expressway At-Grade Rehabilitation of Three Bridges: Park Lawn Road to Humber River (Bridges No. 418, 255, 186)

Decision Type:
ACTION
Status:
Adopted on Consent
Wards:
5 - Etobicoke-Lakeshore, 6 - Etobicoke-Lakeshore

City Council Decision

City Council on April 1, 2 and 3, 2014, adopted the following:

 

1.         City Council award Contract 13SE-21S, Tender Call 14-2014 to Soncin Construction Corporation, in the amount of $23,790,294.00 net of all applicable taxes and charges ($24,209,003.17 net of HST recoveries), for the rehabilitation of the aforementioned F.G. Gardiner Expressway at-grade bridges between Park Lawn Road to Humber River:

 

a.         Bridge 418, F.G. Gardiner mainline and eastbound off ramp over Metrolinx Tracks, east of Park Lawn Road;

 

b.         Bridge 255, F.G. Gardiner mainline over westbound off ramp to Lakeshore Boulevard, east of Park Lawn Road; and

 

c.         Bridge 186, F.G. Gardiner mainline over Toronto Transit Commission streetcar tracks (Toronto Transit Commission Humber Loop), west of Humber River,

 

having submitted the lowest bid, meeting specifications in conformance with the Tender requirements.

 

2.         City Council approve an adjustment to the 2014 Capital Budget and 2015-2023 Capital Plan for Transportation Services that will not change either the total project cost or debt funding for these projects. The adjustment will result in an acceleration of cash flows for the F. G. Gardiner (At-Grade Repairs) project (CTP122-05) of $12.7M million in 2014 from 2015 ($4.4M), 2016 ($2.8M) and 2017 ($5.5M), with an equivalent off-setting deferral of cash flows for the Major Road Rehabilitation project (CTP314-06).

Background Information (Committee)

(February 18, 2014) Report and Attachment 1 from the Executive Director, Engineering and Construction Services, and the Director, Purchasing and Materials Management, on Contract Award - Tender Call No. 14-2014 F.G. Gardiner Expressway At-Grade Rehabilitation of Three Bridges: Park Lawn Road to Humber River (Bridges No. 418, 255, 186)
https://www.toronto.ca/legdocs/mmis/2014/pw/bgrd/backgroundfile-67052.pdf

PW29.3 - Contract Award - Tender Call No. 14-2014 F.G. Gardiner Expressway At-Grade Rehabilitation of Three Bridges: Park Lawn Road to Humber River (Bridges No. 418, 255, 186)

Decision Type:
ACTION
Status:
Adopted
Wards:
5 - Etobicoke-Lakeshore, 6 - Etobicoke-Lakeshore

Committee Recommendations

The Public Works and Infrastructure Committee recommends that:

 

1.         City Council grant authority to award Contract 13SE-21S, Tender Call 14-2014 to Soncin Construction Corporation, in the amount of $23,790,294.00 net of all applicable taxes and charges ($24,209,003.17 net of HST recoveries), for the rehabilitation of the aforementioned F.G. Gardiner Expressway at-grade bridges between Park Lawn Road to Humber River:

 

a.         Bridge 418, F.G. Gardiner mainline and eastbound off ramp over Metrolinx Tracks, east of Park Lawn Road;

 

b.         Bridge 255, F.G. Gardiner mainline over westbound off ramp to Lakeshore Blvd., east of Park Lawn Road; and

 

c.         Bridge 186, F.G. Gardiner mainline over TTC streetcar tracks (TTC Humber Loop), west of Humber River,

 

having submitted the lowest bid, meeting specifications in conformance with the Tender requirements.

 

2.         City Council approve an adjustment to the 2014 Capital Budget and 2015-2023 Capital Plan for Transportation Services that will not change either the total project cost or debt funding for these projects. The adjustment will result in an acceleration of cash flows for the F. G. Gardiner (At-Grade Repairs) project (CTP122-05) of $12.7M million in 2014 from 2015 ($4.4M), 2016 ($2.8M) and 2017 ($5.5M), with an equivalent off-setting deferral of cash flows for the Major Road Rehabilitation project (CTP314-06).

Origin

(February 18, 2014) Report from the Executive Director, Engineering and Construction Services, and the Director, Purchasing and Materials Management

Summary

The purpose of this report is to advise of the results of Tender Call 14-2014 issued for the rehabilitation of the three bridges along the main line of the F.G. Gardiner Expressway between Park Lawn Road and the Humber River in accordance with specifications as required by Engineering and Construction Services, and to request the authority to award a contract to the recommended bidder. The three subject bridges that are to be rehabilitated as part of Contract 13SE-21S are:

 

-           Bridge 418, F.G. Gardiner mainline and eastbound off ramp over Metrolinx Tracks, east of Park Lawn Road;

 

-           Bridge 255, F.G. Gardiner mainline over westbound off ramp to Lakeshore Blvd., east of Park Lawn Road; and

 

-           Bridge 186, F.G. Gardiner mainline over TTC streetcar tracks (TTC Humber Loop), west of Humber River.

Background Information

(February 18, 2014) Report and Attachment 1 from the Executive Director, Engineering and Construction Services, and the Director, Purchasing and Materials Management, on Contract Award - Tender Call No. 14-2014 F.G. Gardiner Expressway At-Grade Rehabilitation of Three Bridges: Park Lawn Road to Humber River (Bridges No. 418, 255, 186)
https://www.toronto.ca/legdocs/mmis/2014/pw/bgrd/backgroundfile-67052.pdf

Motions

Motion to Adopt Item moved by Councillor Mark Grimes (Carried)
Source: Toronto City Clerk at www.toronto.ca/council